• Jim River Bridge

    Jim River Bridge

  • Lake Area Trail

    Lake Area Trail

  • Meridian Bridge Moonlight

    Meridian Bridge Moonlight

  • Lewis & Clark Recreation Area

    Lewis & Clark Recreation Area

  • Walnut Street

    Walnut Street

  • Bragging Rights

    Bragging Rights

  • Downtown Streetscape

    Yankton's Downtown

  • Lewis & Clark Lake

    Missouri River Bluffs

  • 4th of July

    4th of July Fireworks Show

  • Riverside Park

    Riverside Park

  • Meridian Bridge Fog

    Meridian Bridge Fog

  • Meridian Bridge Winter

    Meridian Bridge Winter

  • Meridian Bridge Fall

    Yankton Meridian Bridge Fall

  • Lewis & Clark Lake

    Lewis & Clark Lake walking trails.

  • Yankton 4th of July Fireworks

    Yankton's annual 4th of July fireworks show over the Missouri River.

  • Rockin' Ribfest

    June 3-4

  • Yankton Marina

    Yankton Marina

  • Yankton Missouri River

    Yankton Missouri River

  • Fishing the Missouri

    Missouri River Yankton

  • Meridian Bridge

    Meridian Bridge

  • Ice Sailing

    Missiouri River Ice Sailing

  • Yankton Riverside Park Winter View

    Yankton Riverside Park Winter View

  • Missouri River Yankton

    Merry Christmas

  • Yankton Discovery Bridge

    Yankton Discovery Bridge

2018 City Construction Projects

Print
Press Enter to show all options, press Tab go to next option

The City of Yankton Street Department's street seal coat program will begin late summer with plans for all chip sealing projects to be completed by August 31st, weather permitting. 

The process will be to oil the road and cover it with 3/8" rock chips.  The streets will be closed to traffic during the seal coat process and opened to traffic immediately after the application.  After 1 week, the street sweeper will pick up the excess chips that are still loose.  

“No Parking” signs will be placed on the streets the day before they are sealed.  Please observe these signs and do not park on the streets until the work is done.  Please do not blow grass onto the street before the streets are sealed or permit underground irrigation systems to run water onto the streets while the No Parking signs are up. In the event of rain, the process may be postponed. Thank you for your cooperation during this process.

Map Legend

  Street Reconstruction
  Mill and Overlay
  New Construction
  Miscellaneous
Orange  Chip Seal  

 

Adam Haberman, Public Works Director 
416 Walnut Street
Yankton, SD 57078
Phone: (605) 668-5251